Digital Switchover Seagry Court

In January 2010 NG Rigging were invited to assist The Bridge Networks at Seagry Court.

Riggers attended site to install a 4 metre climbable pole on the rooftop SW corner of the building.

Existing cladding to brick walls were removed to allow drilling for steelwork to be fitted using chemical anchors, approximately 16 chemical anchors were used.

Once anchors had set the steelwork was connected together and the climbable pole fitted, cladding was put back in situ keeping area weatherproofed. Latchways was installed on the structure.

Works were completed by installing Antenna and feeders ready for digital switchover (DSO)

Get in touch

It is obvious to all at AID Rope Access that NG rigging pride themselves on high quality work carried out safely with customer satisfaction their highest priority. AID Rope Access Managing Director