Crane Radar Tower Build
-
case_title}
http://www.ngrigging.co.uk/image_uploads/mitch_1jpg.jpgCrane Radar Tower Build
- http://www.ngrigging.co.uk/image_uploads/mitch_2.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_3.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_4.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_5.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_6.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_7.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_8.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_9.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_10.jpg
- http://www.ngrigging.co.uk/image_uploads/mitch_11.jpg
In March 2009 NG Rigging were invited by Chalcroft to build a 21.6mtr four leg lattice dome tower in the forest of dean.
A four man team of riggers arrived on site 16th March and were informed that the structure had to be built and painted by the 29th March as the crane/lift day had been organised for 13 days time on the 30th March.
This was a challenging project not only with a set deadline of 13 days to build and paint but working in the middle of a forest, uneven/soft ground, missing parts & getting deliveries to site were just a few of the problems we were faced with. However the tower build and lift was completed within the required time constraints.
Following completion of the tower build we were invited to complete additional works on the structure consisting of vertical and horizontal cable tray, 6 face frames and run power cable for platform lighting.