LOS Surveys
NG Rigging provide LoS teams nationally to network operators and ADC for their initial network design and feasibility surveys, following on from these our teams are frequently requested to complete the link installation and commissioning works.
In addition to this service we also conduct post build reactive LoS fault finding surveys which aim to identify and confirm any obstructions on existing links.
Case Study
Swingate 2 Critical Strengthening Project
Swingate was the first large project awarded to NG Rigging as a principal contractor to Arqiva.
read moreLatest News
07/08/2013NG Rigging are pleased to announce the appointment of Rod Morrison as Project Manager
read moreNG Rigging came highly recommended to us and we recommend them without hesitation.Jaggard Group Asst General Manager read more