LOS Surveys

NG Rigging provide LoS teams nationally to network operators and ADC for their initial network design and feasibility surveys, following on from these our teams are frequently requested to complete the link installation and commissioning works.

In addition to this service we also conduct post build reactive LoS fault finding surveys which aim to identify and confirm any obstructions on existing links.

Get in touch

Case Study

Radar Dome Painting

NG Rigging have painted quite a few radar domes at various locations around mainland UK, as with all observation areas they are normally positioned at the highest points in the land where access can be an issue.

read more